Skip to content
YieldScope
Get rate alerts
DeFi pool · Robinhood Chain

USDE
Morpho

Rate snapshots, pool size, source dates and available history.

Collateral incentive APR; this is not the lender's interest rate. No borrowing is required under the checked campaign rules.

Rewards paid in USDe (wrapped); their token price can change.

Some addresses are excluded by the campaign; check its eligibility rules.

Current reward period ends: 2026-11-27 00:00 UTC

Report date: 2026-11-23

Official source

Size last confirmed: 2026-11-09 UTC

Stable pool no IL Single asset
Stability
—
Comparable history is accumulating; stability grade unavailable
APR 4.75 % TVL $362M Chain Robinhood Chain incl. 4.75 % rewards

The source or rate method changed. Earlier total-yield history is not joined across different methods.

Rate and pool-size history

Last confirmed data: 2026-11-23

History recorded from primary sources. Each method is shown separately; missing days are not filled in.

APR
APR 4.75 %
2026-11-12: 5.25 %2026-11-13: 5.25 %2026-11-14: 5.25 %2026-11-15: 5.25 %2026-11-16: 5.25 %2026-11-17: 5.25 %2026-11-18: 5.25 %2026-11-19: 5.25 %2026-11-20: 4.75 %2026-11-21: 4.75 %2026-11-22: 4.75 %2026-11-23: 4.75 %
2026-11-122026-11-23
4.75 % – 5.25 %

No independently dated TVL history is available for this series.

Archived history · DeFiLlama

Last confirmed data: 2026-11-15 UTC

Some values may be out of date. Saved values are shown; check the current rate with the provider.

Archived DeFiLlama history. This series is retained for reference and is no longer refreshed.

APY
APY 5.25 %
2026-07-15: 0.0 %2026-07-16: 0.0 %2026-07-17: 0.0 %2026-07-18: 0.0 %2026-07-19: 0.0 %2026-07-20: 0.0 %2026-07-21: 0.0 %2026-07-22: 0.0 %2026-07-23: 4.5 %2026-07-24: 4.5 %2026-07-25: 4.5 %2026-07-26: 4.5 %2026-07-27: 4.5 %2026-07-28: 4.5 %2026-07-29: 4.5 %2026-07-30: 4.5 %2026-07-31: 4.46 %2026-08-01: 4.27 %2026-08-02: 4.26 %2026-08-03: 4.28 %2026-08-04: 3.87 %2026-08-05: 4.55 %2026-08-06: 4.5 %2026-08-07: 4.5 %2026-08-08: 4.49 %2026-08-09: 4.49 %2026-08-10: 4.36 %2026-08-11: 4.43 %2026-08-12: 4.3 %2026-08-13: 4.5 %2026-08-14: 4.5 %2026-08-15: 4.5 %2026-08-16: 4.5 %2026-08-17: 4.5 %2026-08-18: 4.5 %2026-08-19: 4.5 %2026-08-20: 4.5 %2026-08-21: 4.5 %2026-08-22: 4.5 %2026-08-23: 4.5 %2026-08-24: 4.5 %2026-08-25: 4.5 %2026-08-26: 4.5 %2026-08-27: 4.75 %2026-08-28: 4.75 %2026-08-29: 4.75 %2026-08-30: 4.75 %2026-08-31: 4.75 %2026-09-01: 4.75 %2026-09-02: 4.75 %2026-09-03: 4.75 %2026-09-04: 4.75 %2026-09-05: 4.75 %2026-09-06: 4.75 %2026-09-07: 4.75 %2026-09-08: 4.75 %2026-09-09: 4.75 %2026-09-10: 4.75 %2026-09-11: 4.75 %2026-09-12: 4.75 %2026-09-13: 4.75 %2026-09-14: 4.75 %2026-09-15: 4.75 %2026-09-16: 4.75 %2026-09-17: 4.62 %2026-09-18: 4.75 %2026-09-19: 4.75 %2026-09-20: 4.75 %2026-09-21: 4.75 %2026-09-22: 4.75 %2026-09-23: 4.75 %2026-09-24: 4.75 %2026-09-25: 5.0 %2026-09-26: 5.0 %2026-09-27: 5.0 %2026-09-28: 5.0 %2026-09-29: 5.0 %2026-09-30: 5.0 %2026-10-01: 5.0 %2026-10-02: 4.75 %2026-10-03: 4.75 %2026-10-04: 4.75 %2026-10-05: 4.75 %2026-10-06: 4.75 %2026-10-07: 4.75 %2026-10-08: 4.75 %2026-10-09: 4.75 %2026-10-10: 4.75 %2026-10-11: 4.75 %2026-10-12: 4.75 %2026-10-13: 4.75 %2026-10-14: 4.75 %2026-10-15: 4.75 %2026-10-16: 4.75 %2026-10-17: 4.75 %2026-10-18: 4.75 %2026-10-19: 4.75 %2026-10-20: 4.75 %2026-10-21: 4.75 %2026-10-22: 4.75 %2026-10-23: 5.0 %2026-10-24: 5.0 %2026-10-25: 5.0 %2026-10-26: 5.0 %2026-10-27: 5.0 %2026-10-28: 5.0 %2026-10-29: 5.0 %2026-11-02: 5.0 %2026-11-03: 5.0 %2026-11-04: 5.0 %2026-11-05: 5.0 %2026-11-06: 5.25 %2026-11-07: 5.25 %2026-11-08: 5.25 %2026-11-09: 5.25 %2026-11-10: 5.25 %2026-11-11: 5.25 %2026-11-12: 5.25 %2026-11-13: 5.25 %2026-11-14: 5.25 %2026-11-15: 5.25 %
2026-07-152026-11-15
0.0 % – 5.25 %
TVL $345M

Last confirmed data: 2026-11-15 UTC

Some values may be out of date. Saved values are shown; check the current rate with the provider.

2026-07-15: $109M2026-07-16: $109M2026-07-17: $105M2026-07-18: $97M2026-07-19: $101M2026-07-20: $140M2026-07-21: $156M2026-07-22: $161M2026-07-23: $165M2026-07-24: $175M2026-07-25: $177M2026-07-26: $184M2026-07-27: $183M2026-07-28: $180M2026-07-29: $188M2026-07-30: $192M2026-07-31: $202M2026-08-01: $212M2026-08-02: $212M2026-08-03: $211M2026-08-04: $233M2026-08-05: $237M2026-08-06: $240M2026-08-07: $240M2026-08-08: $250M2026-08-09: $251M2026-08-10: $258M2026-08-11: $259M2026-08-12: $261M2026-08-13: $263M2026-08-14: $270M2026-08-15: $284M2026-08-16: $284M2026-08-17: $285M2026-08-18: $290M2026-08-19: $295M2026-08-20: $296M2026-08-21: $302M2026-08-22: $301M2026-08-23: $305M2026-08-24: $308M2026-08-25: $320M2026-08-26: $317M2026-08-27: $316M2026-08-28: $316M2026-08-29: $319M2026-08-30: $319M2026-08-31: $320M2026-09-01: $321M2026-09-02: $316M2026-09-03: $317M2026-09-04: $317M2026-09-05: $317M2026-09-06: $316M2026-09-07: $319M2026-09-08: $320M2026-09-09: $319M2026-09-10: $319M2026-09-11: $319M2026-09-12: $322M2026-09-13: $322M2026-09-14: $324M2026-09-15: $325M2026-09-16: $327M2026-09-17: $335M2026-09-18: $336M2026-09-19: $345M2026-09-20: $345M2026-09-21: $348M2026-09-22: $342M2026-09-23: $337M2026-09-24: $337M2026-09-25: $336M2026-09-26: $336M2026-09-27: $343M2026-09-28: $341M2026-09-29: $338M2026-09-30: $340M2026-10-01: $343M2026-10-02: $345M2026-10-03: $345M2026-10-04: $351M2026-10-05: $356M2026-10-06: $356M2026-10-07: $356M2026-10-08: $362M2026-10-09: $359M2026-10-10: $359M2026-10-11: $369M2026-10-12: $364M2026-10-13: $364M2026-10-14: $357M2026-10-15: $350M2026-10-16: $351M2026-10-17: $346M2026-10-18: $346M2026-10-19: $357M2026-10-20: $357M2026-10-21: $361M2026-10-22: $360M2026-10-23: $359M2026-10-24: $359M2026-10-25: $362M2026-10-26: $363M2026-10-27: $363M2026-10-28: $361M2026-10-29: $361M2026-11-02: $355M2026-11-03: $354M2026-11-04: $358M2026-11-05: $357M2026-11-06: $344M2026-11-07: $373M2026-11-08: $364M2026-11-09: $363M2026-11-10: $365M2026-11-11: $365M2026-11-12: $359M2026-11-13: $358M2026-11-14: $360M2026-11-15: $345M
2026-07-152026-11-15
$97M – $373M
Transparent scoring

Why this grade

the formula →

Comparable history is accumulating; stability grade unavailable

Risks

What to watch for

⚠ Smart-contract risk

Any funds in a DeFi pool sit inside a smart contract that can be exploited or contain bugs. An exploit = funds are lost forever. Before depositing, check Morpho's age, audits, and incident history.

⚠ Stablecoin depeg

A stablecoin in the pool can lose its dollar peg — especially newer or algorithmic ones. Check the issuer and its reserve transparency.

⚠ Rewards in protocol tokens

Part of the yield (4.75 %) is paid in the protocol's own token. If that token's price drops, your real yield drops too. Emissions can also be reduced or end.

Chain risk (Robinhood Chain)

Funds live on the Robinhood Chain blockchain. If it halts, congests, or is attacked, access to funds can be temporarily lost. If the pool contains "wrapped" tokens from another chain (e.g. WBTC is a copy of Bitcoin on Ethereum), bridge risk also applies: a bridge hack means those assets are lost.

⚠️ High-risk platform

Proceed anyway →